PM Contracting transformed a traditional HVAC system in a 52,000 sq ft church addition. With precise climate control and remarkable efficiency, our solution ensures reliable comfort for daily use.
Scope or Service/Installation
The JCI installation consisted of the following:
Time Frame/Duration: 10/28/2020 to 12/1/2021
Results/Efficiency Improvements: The existing building consisted of traditional constant volume package roof top units with electric reheat, but with the growth of the church and the need for occupancy nearly every day of the week, we knew we needed to provide a more efficient way to condition the building.
The 52,000 sq ft addition has been in operation now for two years and has proven to offer very tight control of all spaces and extremely efficient for the size of system.